Well I decided to move one of the blast furnaces to create more of a view to the massive Powerplant #1 structure rather than hiding it. The results are pictured below with still some Stako metal systems for carrying piping to be installed. This is kind of a throwback to Bethlehem Lackawanna's plant where there was a considerable distance between
(
Read more... )
Comments 2
Reply
CMR's are more of a cottage industry with low hand packed production numbers hence higher costs. There is a small market for these and higher priced Craftsman type stuff like FSM but it's very limited. I think the cheapest HO high rise CMR is around $200...quite a bit.
Reply
Leave a comment