2 year plan

Jun 22, 2009 10:58

There are roughly 15 areas of the house to be considered:

Ground level
  • Kitchen
  • Living room
  • Raised living room (the living room has a step in the middle)
  • Hallway
  • Bathroom
  • Bedroom 1
  • Bedroom 2

Basement level
  • Inner den (inner and outer dens are same room for now)
  • Outer den
  • Basement kitchen
  • Basement bathroom
  • Basement hallway
  • Laundry
  • Death room
  • Boiler room

Step 1 (move in): We'll be using bedroom 1 as Usha's, bedroom 2 as ours, the living room as the living room, the raised living room as my office, the basement kitchen as the kitchen, and the death room as the sewing room.
  • Floors
    • Rip out carpets in Bedroom 1, Bedroom 2, Hallway, Living, Raised Living (done by us)
    • Bamboo in Hallway, Raised Living (to be done by contractor, hopefully this week)
    • Refinish hardwood in Bedroom 1, Bedroom 2 (in progress by us - see facebook album)
    • Carpet in Living (to be done by contractor after we move in, since carpet takes ~10 days to arrive)
  • Paint
    • Bedroom 1, Living (to be attempted by us - probably some now, some after we move in)
  • Get appliances (portable dishwasher, laundry machines) (probably shortly after moving in)

Step 2 (first priorities): We plan to move back to the upstairs kitchen, make a master bedroom out of the inner den, and move the sewing room upstairs.
  • Kitchen
    • Rip out existing kitchen (probably move cabinets to garage), sell/give away old electric stove.
    • Put in new cabinets, dishwasher, stove. (possibly reusing downstairs cabinets)
    • Move kitchen (food, fridge, etc) upstairs.
  • Master Bedroom (in what is now Inner Den)
    • Rip out flooring
    • Seal vent leading to boiler room
    • Possibly replace window to bring to code
    • Add hot tub (hopefully)
    • Put up wall
    • Add closets
    • Add carpet/flooring
    • Move from Bedroom 2 to new master
  • Move sewing room from Death room to Bedroom 2

Step 3 (later): A mix of projects that can be done at that point
  • Make an office for me out of the now-empty Sewing room (previously Death room)
  • Make a baby room out of the now-empty Basement kitchen
  • Redo both bathrooms (one at a time, of course) more or less from scratch
  • Do something with the boiler room
  • Do something with the outer den
  • Make a work space in the garage
  • Once there's an office, figure out what to do with the now-empty Raised living room
  • Outside work (garden, path to front door, etc)
  • Replace floors in miscellaneous areas (stairs, entrances, remaining basement)