I have managed to get the following done from the list
Projects completed so far.
- New computer built up complete with new case, with 3 x SSDs in it and 2 x hard disks, as well as a much better Quadro Graphics card.
- Antennas to be installed. (temporary 5 element 2m + 5 element 70cms yagi installed), GP15 (6,2 & 70Cms) installed/
- Satellite Antennas to be obtained (tested ok)
- 23Cms yagi 2x 36 element + 1x 18 element as well as 23 element 70cms yagi.
- Yard to be cleared and a lot of dirt to be removed. (some 26 massive truck loads later it was done).
- Retaining walls need to be built (265 x 300 kg blocks later they are done).
- Desk changed so that all computers and radios can use the space better. (was given a new desk and I made a corner unit for the desk) & still adding more radios to the desk so far it looks great).
Comments 1
Projects completed so far.
- New computer built up complete with new case, with 3 x SSDs in it and 2 x hard disks, as well as a much better Quadro Graphics card.
- Antennas to be installed. (temporary 5 element 2m + 5 element 70cms yagi installed), GP15 (6,2 & 70Cms) installed/
- Satellite Antennas to be obtained (tested ok)
- 23Cms yagi 2x 36 element + 1x 18 element as well as 23 element 70cms yagi.
- Yard to be cleared and a lot of dirt to be removed. (some 26 massive truck loads later it was done).
- Retaining walls need to be built (265 x 300 kg blocks later they are done).
- Desk changed so that all computers and radios can use the space better. (was given a new desk and I made a corner unit for the desk)
& still adding more radios to the desk so far it looks great).