So.. if anyone is actually interested.
This is what I've been stressing out about at work.
This is the 3D model of the construction layout for the CU Visual Arts center. Mind you.. this is 1/2 of the basement level. There are 4 floors in addition to the basement, and an underground plan we have to do. I've been drawing all of the electrical work, including conduits, lighting fixtures, audio visual systems, and telcom routing. There are other companies that input the HVAC and plumbing systems. We have to coordinate with one another to make sure each of our systems isn't colliding with theirs, as well as making sure we don't run into any structural elements. I'm working with an electrical project manager that doesn't really provide me much information, so I'm having to just wing a lot of this.. it's hard. I kind of want to just shoot msyelf in the head.. as this project will go on until around December. Oof.. it's good on my resume right?