Yep. Next up are: 1- finishing the wood trim (downstairs) 2- staining the woodwork (stairs, doors, trim, etc) 3- second coat of interior paint, and first coat in the garage 4- gutters and downspouts 5- rear decks and front porch 6- carpet 7- air conditioning (ironic), humidifier, grates for air returns, thermostat 8- final security system 9- light fixtures (should be en route now) 10- kitchen countertops, toilets, pedestal sink, faucets, etc
Comments 7
What a Christmas card your house photograph is!
Getting close now--soon floors and carpets!
Reply
1- finishing the wood trim (downstairs)
2- staining the woodwork (stairs, doors, trim, etc)
3- second coat of interior paint, and first coat in the garage
4- gutters and downspouts
5- rear decks and front porch
6- carpet
7- air conditioning (ironic), humidifier, grates for air returns, thermostat
8- final security system
9- light fixtures (should be en route now)
10- kitchen countertops, toilets, pedestal sink, faucets, etc
Reply
Reply
Reply
It won't be long now!!!
bronwyn
Reply
Reply
Leave a comment