Just had the Director of Physical Plant get irate with me over the phone, and I told him to call my director, and hung up on him. In December there was a water main break under the Physical Plant office, which flooded the office with mud. We pulled out all their equipment. I was asked to provide a cost estimate for the replacement of the cabling,
(
Read more... )