So, in a surfeit of work, I shifted 16 cubic feet of soil on Saturday night while everyone was partying. I dug a 4’ by 4’ hole, and then I sifted it all back in. The result was a nice, soft, loosely packed soil. That took about 3 hours. On Sunday at twilight, I laid out the grid and used a small 1 1/2” bowl to make indentations in the right
(
Read more... )