With help from M, J and Middle Thursday, I got the south half of the battery bank replaced, wired and connected. Then with M, J and D helping, we did the north half Friday. M & I used the crane to remove the old S bank, but the rest of the battery hoisting was done by hand using a carrying pole. The battery sling I rigged worked out well. Now
(
Read more... )